Tools Needed

Net (A)
Net (A)



Instructions

Drill Hammer Carabineer (C) Position the Net (A) Clip the Net (A) to the Carabineers (C) Net over pond Clip all remaining Carabineers (C) to the Net (A)

 

 


Net Installation Manual

You will also need:

Anchor (B)Carabineer (C)   DrillDrill BitMarking ToolHammerOptional soft ground stakes
Anchor (B)       Carabineer (C)   Cordless Drill   Drill Bit*    Marking Tool    Hammer     Optional Soft Ground Fixing

-£35 for 10 pack

** 6.5mm into Stone; 5mm into Aluminium; 6mm into Wood



Drill a hole at 0.8m intervals around the entire edge of the pond.
If the pond edge has corners ensure that a hole is also drilled into the corner. This in addition to the holes at 0.8m intervals.


 

Using a hammer tap an Anchor (B) into each hole until just the eye of the Anchor (B) is visible above the surface.
N.B.  Place a screwdriver into the eye of the Anchor (B) whilst tapping the Anchor (B) into the holes. This prevents the eye of the Anchor (B) closing when tapping with the hammer.



Clip a Carabineer (C) into each eye of the Anchors (B).
Position the Carabineers (C) so that the carabineer (C) clip catch is facing outwards towards the water.





Position the Net (A) over the entire pond surface ensuring that all carabineers (C) are covered underneath the Net (A). Also ensure the squares within the Net (A) are kept as linear as possible.




Starting with the corners, clip the Net (A) to the Carabineers (C).
N.B. Ensure to pull tightly and tension the Net (A) before clipping each corner whilst still maintaining the linear nature of the Net (A).



Select a Carabineer positioned in the middle of the pond; clip the Net (A) to the Carabineer (C).
At the opposite facing  Carabineer (C) connect the Net (A) to the Carbineer (C).
Repeat the above until all middle Carabineers (C) are connected to the Net (A).
N.B. Ensure to pull tightly and tension the Net (A) before clipping each corner whilst still maintaining the linear nature of the Net (A).



Clip all remaining Carabineers (C) to the Net (A) ensuring to tension the Net (A) before clipping each Carabineer.
N.B. Ensure to pull tightly and tension the Net (A) before clipping each corner whilst still maintaining the linear nature of the Net (A).

You Should now have a Pond Safety Net similar to the one below:

 

Finished Net

To receive your receipt and guarantee please send four photos (from four different angles) of your completed Net  installation.

Extra Help?
We can always come and fit your Pond Safety Net for you. Please call the office to obtain a quotation.

To download a PDF version of this manual, please click here